Release date:2025-01-23
Author:IPT
Petrochemical project high-power multistage pump successfully passed the test
Through the performance test, vibration test, cavitation test, temperature rise test, running test and so on, all the indicators meet the expected requirements.
Prev:Null
Next:Null